Advertisement
  • National News
  • VA State News
  • WV State News
  • Contact Us
  • Submit Content
  • Subscribe
Subscribe For $2.50/month
ePrint Editions
New Castle Record
  • News
    • Local
    • Sports
    • Obituaries
    • Notices
    • Education
    • Church
  • Legals
  • About Us
  • Contact Us
  • eRecord
  • Classifieds
  • FAQ
  • Login
No Result
View All Result
  • News
    • Local
    • Sports
    • Obituaries
    • Notices
    • Education
    • Church
  • Legals
  • About Us
  • Contact Us
  • eRecord
  • Classifieds
  • FAQ
  • Login
No Result
View All Result
New Castle Record
No Result
View All Result

VDOT Roadwatch

Mountain Media, LLC by Mountain Media, LLC
June 10, 2025
in Local Stories
0
VDOT Roadwatch
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter

INTERSTATE 81

Bridge Maintenance – Pulaski County

On-ramps to Route 100 (northbound and southbound) off I-81 will be closed from 8 p.m. to 6 a.m., Sunday through Friday mornings. Times and days may vary—check message boards for updates.

Widening: Exit 137 to Exit 141 – Roanoke County / Salem

Project to widen I-81 from two to three lanes. Traffic will be maintained in both directions. Expect alternating lane closures, narrow lanes, traffic shifts at Thompson Memorial Drive and Wildwood Road, flagging operations on Route 635/619, uneven pavement, and a reduced work zone speed of 60 mph.

Widening: Exit 143 to Exit 151 – Roanoke County / Botetourt County

Shoulder strengthening and barrier wall installation underway. Expect nighttime lane closures, narrowed ramps at exits 143, 146, 150, daytime flagging on Belle Haven Road, and a posted work zone speed limit of 60 mph.

Deck Overlay – Mile Marker 95.7 (Peak Creek)

Northbound and southbound bridges undergoing repair. Expect alternating nighttime lane closures between MM 96 and 94.

New River Bridge Replacement – Exit 105

Traffic has shifted to a new bridge. Expect lane closures between MM 106 and 104, flagging on Route 605, and periodic slow rolls on I-81 between MM 98 and 109.

Deck Repairs – MM 89 to 170

Nighttime right and left lane closures will be in place in both directions.

 

INTERSTATE 581

Patching Operations

Northbound and southbound paving and patching operations scheduled Sunday through Thursday, 7 p.m. to 7 a.m. Expect delays.

 

INTERSTATE 77 (CARROLL COUNTY)

Paving and Patching Operations

Nighttime right, left, and center lane closures Monday through Friday, 7 p.m. to 5 a.m.

Bridge Deck Repairs

Nighttime right and left lane closures, 7 p.m. to 6 a.m. Deck overlays underway between 8.78 miles north of NC line and 6.24 miles south of Route 58. Closures under the bridge on Route 148.

 

ROANOKE CITY

Orange Avenue Off Ramp Safety Improvements

Shoulder closures, narrow ramps, and nighttime lane closures expected along Route 460 and I-581 off-ramp.

 

ROANOKE COUNTY

Bradshaw Road (Route 622) Culvert Replacement

Temporary signal controlling one lane around-the-clock. Located 6.8 miles from Route 311.

Route 220/419 Diverging Diamond Interchange

Project reconfigures interchange and multiple surrounding intersections. Delays and phased completions expected.

Route 220 Intersection Improvements at Southern Hills & Valley Ave

Nighttime lane closures Sunday through Friday. Daytime shoulder closures possible.

 

CRAIG COUNTY

Craig Botetourt Scenic Trail Maintenance

Brush cutting and stabilization work along old railbed. Public meetings scheduled.

 

FLOYD COUNTY

Route 712 (Hope Road) Surface Treatment

Single lane closures and flagging in place. One-week detour via Robertson Mill Road. Completion summer 2025.

 

FRANKLIN COUNTY

Brick Church Road Connector Project

Road closed near Pleasant Breeze Drive. Temporary signal in use. Flagging during construction. Anticipated completion late 2025.

 

GILES COUNTY

Route 778 (Apache Road) Bridge Replacement over Sinking Creek

Road closed with detour. Message boards alerting drivers. Completion summer 2026.

 

HENRY COUNTY

Route 220 Pedestrian Project

Lane closures at Daniels Creek Road and Moss Street. Expected completion October 2025.

 

MONTGOMERY COUNTY

Route 8 Park and Ride

Project near I-81 MM 114. Alternating lane closures and flagging on Route 8 and Route 666. Completion expected winter 2027.

 

PATRICK COUNTY

Route 58 Lover’s Leap Project

Clearing and grading underway. Speed limit 45 mph. Expect delays due to blasting and flagging operations.

Route 58 Lover’s Vesta Project

Widening and bridge replacement near Meadows of Dan. Temporary roads and brush clearing underway. Public meeting planned.

 

PULASKI COUNTY

No projects reported at this time.

 

 

Previous Post

Kick off summer at the Hello Summer Festival on June 20

Next Post

All-Pioneer District teams are announed

Next Post
All-Pioneer District teams are announed

All-Pioneer District teams are announed

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • News
  • Legals
  • About Us
  • Contact Us
  • eRecord
  • Classifieds
  • FAQ
  • Login

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.

  • Login
Forgot Password?
Lost your password? Please enter your username or email address. You will receive a link to create a new password via email.
body::-webkit-scrollbar { width: 7px; } body::-webkit-scrollbar-track { border-radius: 10px; background: #f0f0f0; } body::-webkit-scrollbar-thumb { border-radius: 50px; background: #dfdbdb }
No Result
View All Result
  • News
    • Local
    • Sports
    • Obituaries
    • Notices
    • Education
    • Church
  • Legals
  • About Us
  • Contact Us
  • eRecord
  • Classifieds
  • FAQ
  • Login

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.